Description: A GIS point feature class tracking marker balls at given locations of Town of Cary buried Infrastructure within the Water, Stormwater, Reclaimed, Sewer disciplines.The data is jointly owned between Stormwater, Public Works and Utilities departments.
Description: The SS_AllBasins data was compiled/merged from two sources: basinsEdited.TAB, and ChathamBasinsEdited.TABPreviously located here: X:\WorkSpaces\EN\Utilities\Sewer\2003WastewaterCollectionSystemMasterPlan\Proposed Corrections\basinsEdited.TAB; Generated from shapefiles provided by H&S with the 2010 Wastewater System Master Plan. These individual regions have been updated based more detailed topographic information and as new development plans are submitted with minor modifications to sewer service areas. Corresponds to Figure 2-4.Previously located here: X:\WorkSpaces\EN\Utilities\Sewer\ChathamBasinsEdited.TABGenerated from Cary-Chatham Co LUP Rural Buffer Zone data form Planning - X:\WorkSpaces\PZ\GIS\SpecialProjects\ChathamCaryJointLandUsePlan\GIS Data 11-29-11\Rural Buffer Zone.TAB – Primarily used streets to cut basin boundaries. (Comparable to Figure 3 in Chatham Co Sewer Basin Planning TM. TREATMENT00 - TREATMENT02 fields are the Sanitry Sewer flow destination in alternate scenarios. TREATMENT_FACILITY field is the Sanitary Sewer flow destination in the current base model. DOWNSTREAM_FAC field is the downstream facility